Corporate Structure
Lockwood Hills LLC, the owner of Lockwood landfill, and Greenidge
Generation LLC, the owner of Greenidge Generating Station, are both
subsidiaries of Greenidge Generation Holdings Inc. For details of
the corporate structure, see the Form
S-1 Registration Statement filed by Greenidge Holdings with the
Securities and Exchange Commission on September 20, 2021.
NYS DEC Permits and Permit Proceedings
Lockwood Ash Disposal Site
SPDES Permit NY-0107069 and Part 360 Permit 8-5736-00005/00003-0
Modified
and renewed SPDES permit issued 5/18/22 effective 07/01/2022, expiration
06/30/2027.
Comment letter on draft SPDES permit and Type II SEQRA determination,
submitted by Sierra Club Atlantic Chapter, Seneca Lake Guardian,
the Committee to Preserve the Finger Lakes, Cayuga Lake Environmental
Action Now (CLEAN), South Shore Audubon, Stop the Algonquin Pipeline
Expansion, Grassroots Environmental Education, NYPAN Environmental
Committee, People for a Healthy Environment, Inc. and Fossil Free
Tompkins, January 7, 2022.
ENB Notice of Comment Period on Draft SPDES Permit and SEQRA
December, 8,
2021. Provides notice that DEC has prepared a draft permit with modifications
and has issued a Type II SEQRA determination. Comments due January
7, 2022.
Draft
Permit, December 2, 2021.
Notice
of 'Complete Application, November 30, 2021.
Permit
Fact Sheet, November 12, 2021.
Wet
Weather Sampling Results, EnSol Inc., September 9, 2021.
2021 First Quarter Environmental
Monitoring Report (EMR), Daigler Engineering, June 2021.
Landfill
Gas Generation Report, Daigler Engineering, June 2021.
Mercury
Minimization Program 2020 Annual Report, Daigler Engineering,
March 2021.
2020 Annual
Groundwater Monitoring and Corrective Action Report, January
2021.
Lockwood
Response to Notice of Incomplete Application, Daigler Engineering,
October 9, 2020.
Part
360 Permit Renewal Facility Manual, Daigler Engineering, August
2020.
Part
360 Permit Renewal Engineering Report, Daigler Engineering,
August 2020.
Part
360 Permit Renewal Construction Quality Assurance Plan, Daigler
Engineering, August 2020.
Lockwood
SPDES Renewal/Modification Application, Daigler Engineering,
May 2020.
Lockwood
SPDES Renewal/Modification Application, Proposed
Outfall Modifications, Daigler Engineering, May 2020.
Notice
of Incomplete Application (NOIA), March 3, 2020.
2019 Annual
Report, Daigler Engineering, February 2020.
Certification
Report: Settling Pond Sediment Removal and Improvements, Daigler
Engineering, December 2019.
Notice
of Construction Completion, Sediment Pond Sediment Removal and
Improvement Work, Daigler Engineering, October 31, 2019.
Leachate
Management Plan with Enhanced Minimization Elements, Daigler
Engineering, October 2019.
Stormwater Pollution Prevention
Plan (SWPP), Daigler Engineering, June 2019.
Investigation
of Solids Scouring during Leachate Pond Discharge Events, May
31, 2019.
Mercury Minimization
Program 2018 Annual Report, March 2019.
2018
Annual Report, Daigler Engineering, March 2019.
Site
Development Plan and Updated Consent Order Schedule,Daigler
Engineering, September 18, 2018.
DEC
Comments on Leachate Management Plan, Daigler Engineering,
June 2018.
Consent
Order Engineering Report, Leachate Management and Pond Sediment
Removal Plan, Daigler Engineering, August 2015, revised December
2018.
Part
360 Permit Renewal Application, Daigler Engineering, March
2018.
2017
Annual Report, Daigler Engineering, March 2018.
Amendment
to Consent Order amending schedule for compliance, July 10,
2017.
Construction
Report: Leachate Flow Metering System & Stormwater Separation
Construction, Daigler Engineering, January 2017.
Amendment
to Consent Order amending schedule for compliance, Februrary
24, 2016.
Notice
that SPDES permit expiration date will be extended while DEC completes
technical review of the permit, February 18, 2016.
Consent Order,
February 19, 2015.
Notice
of Commencement of Lockwood Enforcement Action, July 14, 2014.
Lay-up Plan,
Daigler Engineering, May 2011.
Current
SPDES Permit Issued 2005, Modified 2010
Permit ID: NY-0107069
Effective Date: 12/01/2005, Expiration Date: 11/30/2010
Modification Dates: 08/01/2009, 04/01/2010
Current
Part 360 Permit Issued 2008
Permit ID: 8-5736-00005/00003-0
Effective Date: 9/5/2008, Expiration Date: 9/4/2018
Compliance with EPA CCR Requirements
Both Greenidge Generating Station, which has an onsite coal
ash pond and Lockwood Coal Ash Landfill are required to comply
with EPA's Coal Ash Residual (CCR) requirements.
EPA
moves to crack down on dangerous coal ash storage ponds, Matthew
Daly/AP, NewsNation, January 11, 2022. "The Greenidge
Generation plant in Dresden, New York, was ruled ineligible for
an extension."
Detailed
Facility Report for Greenidge Generation LLC, EPA's Envorcement
and Compliance History Online (ECHO)
Greenidge Generation LLC CCR
Rule Compliance Data and Information
Detailed
Facility Report for Lockwood Hills Coal Ash Disposal Site,
EPA's Envorcement and Compliance History Online (ECHO)
Lockwood Hills LLC Combined
Coal Residuals (CCR) Rule Compliance Data and Information
Media
State
considering renewal of Lockwood Ash Disposal Landfill permit,
Finger Lakes Times, December 15, 2021.
Lockwood
Hills landfill to become solar farm, Dundee Chronicle-Express,
July 30, 2021.
Restart
of Greenidge Power Plant Hinged on DEC Downplaying Toxic Landfill,
Peter Mantius, Waterfront Blog, June 12, 2018.
Torrey
residents get landfill answers, Amanda Folts, Finger Lakes
Times, March 12, 2009.
Coal Ash Cleanup Resources
Mapping
the Coal Ash Contamination, EarthJustice, July 29, 2021.
Cleaning
Up Coal Ash For Good, EarthJustice, July 2021.
Leaking
and Looming, Legacy Coal Ash Ponds Spew Poisons. Is There One Near
You? Lisa Evans, EarthJustice, October 1, 2020.